The ANIMAS RIVER TRAIL (map) has approximately 7 miles of hard-surface trail running through town along the beautiful Animas River, with 2.5 additional miles planned for the future. The north end of this popular trail is the intersection of 32nd Street and E. 2nd Ave. (across the river from City Market North). It travels south through twelve city parks and across five bridges to the south end.

Weeminuche Construction is working with the City to complete the segment of Animas River Trail between the Durango Mall and Durango Harley Davidson. 

Go to Animas River Trail North Extension for information on future development north of 32nd Street.

The development of the Animas River Trail in Durango has occurred over several decades, beginning in the 1970s. A summary of the approximate dates the various sections were completed:

Year Trail Segment Description Comments
1976 29th Street to the pedestrian bridge behind the Fairgrounds First asphalt trail segment completed by the City
1978 Placement of the Pedestrian Bridge behind the Fairgrounds Old footbridge, relocated from Smelter Mountain
1978 Trail behind the High School Constructed when the High School was built
1979 Rank Park trail segment Park development and trail adjacent to the High School
1980 Trail segment from Hwy 160 at Camino del Rio to Whitewater Park Trail was constructed with the Hwy 550 project
1984 Riverfront Park trail segment Trail was constructed with the development of the park
1984 Doubletree Hotel trail segment Trail was constructed by the hotel when it developed
1986 Whitewater and Santa Rita Park trail segment Trail was constructed with the development of the park
1991 Santa Rita Park trail segment, near the playground to the pedestrian bridge Included the conversion of the existing La Posta Rd bridge to a pedestrian only bridge
1992 Mercy Hospital trail segment, between the hospital and railroad tracks
Constructed in the railroad right of way
1992 Iris Park trail segment Trail was constructed with the development of the park
1993 Trail segment from Santa Rita bridge to the Durango Mall Trail was constructed with the
extension of the sewer line south
1994 Albertsons trail segment Trail was constructed by Albertsons when it developed
1996 Hwy 160 underpass Linked the trail behind the Doubletree to the Hwy 550 trail segment
1996 Junction Creek pedestrian bridge Linked the trail behind the hospital to Rank Park
1996 Rotary Park pedestrian bridge and trail Linked the trail behind the hospital to Rotary Park
1998 Holiday Inn trail segment Linked the trail from 9th St. to the trail behind Albertsons
1998 Walmart trail segment
Trail was constructed by Walmart when it developed
2001 Iris to Schneider Park Bridge and Trail Linked the trail in Iris Park through Schneider Park to 9th Street
2002 9th St. Underpass Linked the trail along the 9th St. Bridge to the Holiday Inn trail segment
2004 15th St. to Swinging Bridge Linked the trail in Riverfront Park to 15th St.
2005 Cundiff Park to Rivergate bridge and trail Spur trail from Cundiff Park to Rivergate
2005
Main Ave. Underpass Linked the trail in Rotary Park to 15th St.
2006 Durango Mall Segment Constructed trail segment to the east of the Durango Mall
2007 Skate Park Spur Constructed spur along the skate park between the Schneider Park Bridge and the north end of Roosa Ave.
2007 Humane Society Segment

Constructed trail segment to the west of the La Plata County Humane Society, linked to the north end of the Wal-Mart section
2008 Segments: Library/Albertsons/Escalante Constructed trail segments behind Durango Public Library, Albertsons and Escalante Middle School
2009 Escalante Crossings Subdivision Constructed trail segment behind Escalante Crossings Subdivision
2010 Pedestrian Bridge and Trail by High Bridge Constructed trail segment and pedestrian bridge linking trail behind Durango Mall to the High Bridge near the Humane Society

Hard Surface Trails

Soft Surface Trails

Overend Mountain Park

Located West of Durango and has a natural surface trail system of approximatley 12.1 miles.  Trail head located at the Manna Soup Kitchen on Avenida del Sol.

Dalla Mountain Park

Located North-West of Durango and has a natural surface trail system of approximatley 4.7 miles Trail head is located on Junction Creek Rd.

Animas City Mountain

Located North of Durango and has a natural surface trail system of approximately 9.2 miles. Trail head is located on West 33rd St.

Horse Gulch

Located East of Durango and has a natural surface trail system of approximatley 57.2 miles. Trail head is located on 3rd St. and 9th Ave.


Parks and Recreation

Twitter icon

FaceBook Icon

 

 

 


2700 Main Ave
Durango, CO 81301
970-375-7300
rec@ci.durango.co.us



About Us     Contact Us     Policies

Powered By: Savvy Content Manager